Evapco Cooling Tower SandBlasted and coated V570 Pancrete
Sand blast entire interior wall of tower to remove
all calcium/rust build-up. Remove & reinstall at completion of process:
NEW: Drift Eliminators, Fill & Float to be installed.
Prep tower with 2 coats (14 mils) of V570 a Rust/corrosion inhibitor coating; this to be completed
over a 2 day process allowing coating to dry and
adhere to prepped metal surface. Pour
Pancrete (rust/corrosion inhibitor) to base of tower at ¼".
The coating process comes with a 10 year warranty.
Tower will be done over a period of four days.
Priced per $AVE Contract# 08062-S
Call us today to look at your cooling towers!